top of page
Search

Framingham State University, Campus Power Plant – Framingham, MA, Campus Power Plant – Framingham, MA

The DCAMM Certified Study has been accepted and the design portion of the repairs to the Framingham State University Campus Power Plant and Tunnel is green lit. Investigation has begun for the HVAC, Electrical, Plumbing, and Fire Protection design in support of Structural and Civil repairs. The F&T scope includes repair to MEP/FP systems but includes resiliency consideration for continued use of campus wide utilities while repairs are being implemented. As the Owner’s Engineer, F&T frequently helps keep utilities uninterrupted while necessary work is completed.


Framingham State University, Campus Power Plant – Framingham, MA

Framingham State University, Campus Power Plant – Framingham, MA

NAVIGATE

VISIT US

Fitzemeyer & Tocci Associates, Inc
300 Unicorn Park Drive,
5th Floor
Woburn, MA 01801
(781) 481-0210​ | info@f-t.com

STAY CONNECTED

  • facebook
  • youtube
  • linkedin

©2022 by Fitzemeyer & Tocci Associates, Inc. 

bottom of page