F&T was recently featured in High Profile Magazine regarding out collaboration with SGA, Dream Collaborative, Timberline Construction, and the Cumming Group on providing facility design and construction administration at Catalent.
Catalent, a firm specializing in supporting pharmaceutical, biotech, and consumer health partners, recently completed an upgrade at its Chelsea facility, a Center of Excellence for spray dry dispersion and Dry Powder Inhaler (DPI) capsule manufacturing and packaging. The renovation project focused on enhancing potent compounding spaces to support isolated production, meeting the highest industry standards for pharmaceutical manufacturing.
Given the precise environmental requirements for pharmaceutical production, Fitzemeyer & Tocci designed a state-of-the-art HVAC system to meet strict temperature and humidity specifications.
コメント