Location Lebanon, NH Overview Dartmouth Hitchcock Medical Center needed to renovate its new Platelet Production GMP laboratory, including an ISO Class 7 clean room with multiple biosafety hoods, ISO Class 8 workroom, and ISO Class 8 anteroom. The mechanical...
read more »
Location Billerica, Massachusetts Overview Lantheus Medical Imaging needed to modify and upgrade the existing Bldg. 150 HVAC radiological waste warehousing and storage systems. The mechanical systems included new ventilation and exhaust systems, redundant heating equipment, and implementation of direct...
read more »
Location Billerica, Massachusetts Overview Lantheus Medical Imaging renovated and upgraded the HVAC systems supporting Building 200 production clean room (CPA) areas. This included evaluating the existing HVAC systems within the CPA in accordance with LMI user requirements, evaluating existing...
read more »
Location Billerica, Massachusetts Overview Lantheus Medical Imaging needed to replace existing water-for-injection (WFI) cooling heat exchanger systems. FItzemeyer & Tocci perform the engineering analysis to determine the requirements and produce design documents for this project.
Location Hudson, New Hampshire Overview Johnson Precision Production needed to study existing manufacturing/production clean rooms to conform existing manufacturing/production spaces into ISO Class 8 compliance and prepare feasibility assessment to enable a portion of the space to be upgraded...
read more »
Location Billerica, Massachusetts Overview Lantheus Medical Imaging needed to address condensing issues within existing lab isolator units. Fitzemeyer & Tocci designed a solution that included developing a secondary cooling loop, separated and supported by existing low temperature plant chilled...
read more »
Location Boston, Massachusetts Overview Simmons College renovated the wet lab and office areas of the Park Science Center to provide energy efficient and easy to maintain air handling, sprinkler, power and lighting, and laboratory gas and vacuum systems. Fitzemeyer...
read more »
Location Cary, North Carolina Overview Linear Technology constructed a new electronics testing laboratory and research center in Cary, including new mechanical and electrical systems to support electronics research and testing room and equipment and processes, and high efficiency lighting...
read more »
Location Dartmouth College, Hanover, New Hampshire Overview Dartmouth College relocated and built a new Life Sciences Center to house new electron microscope laboratories and research support space. The mechanical electrical design incorporated low speed laminar air distribution in the...
read more »
Location Billerica, MA Overview Lantheus Medical Imaging upgraded systems serving the C-wing laboratories in its Bldg. 200. The project included a new 100% outside air ventilation unit coupled to high-plume exhausters, each with glycol run-around heat recovery systems. Interior...
read more »
Location Mountainview, California Overview TDK RF needed to renovate the10m Anechoic EMC testing chamber at Apple Evelyn-1 testing site. The chamber renovation included upgrade of the existing HVAC distribution systems, all new lighting systems, new fire suppression systems, and...
read more »
Location Concord, Massachusetts Overview Emerson Hospital expanded to install a new 5,800 sq ft Linear Accelerator suite installation, to provide recent advances in radiation treatment to their patients. The imaging tools within the Linear Accelerator (treatment machine) enable precise...
read more »
Location Lebanon, New Hampshire Overview Dartmouth-Hitchcock Medical Center & Dartmouth Medical School needed several magnetic resonance imaging systems and diagnostic and research suites, including positive electron tomography (PET) and fluoroscopy (X-ray) imaging rooms, two 3-tesla MRI machines, and one...
read more »
Location Keene, New Hampshire Overview Cheshire Medical Center replaced the existing Linear Accelerator (LINAC) equipment. The project required a new electrical infrastructure, upgrades to the plumbing and fire protection systems, and replacement of the existing process chilled water systems....
read more »
Location Tijuana, Mexico Overview TDK RF needed to build a new 3m Anechoic EMC testing chamber at Hitachi manufacturing’s Mexico production facility. The radio frequency testing chamber design included new HVAC distribution systems, lighting systems, new fire suppression systems,...
read more »
Location Detroit, Michigan Overview Nissan Motors Design constructed a 5,000 sq ft vehicle radio frequency (RF) test chamber and control room to support anechoic testing of vehicle and equipment. The chamber design included new exhaust capture systems, engine cooling...
read more »
Location Vancouver, Canada Overview TDK RF needed to build a new 3m Anechoic EMC testing chamber at Nokia manufacturing’s Vancouver production facility. The radio frequency testing chamber design included new pre-action fire suppression systems, and new air sampling fire...
read more »
Location Ypsilanti, Michigan Overview TDK RF needed to build a new 10m anechoic antenna testing chamber at the Asashi Glass Michigan research facility. The radio frequency testing chamber design included new HVAC distribution systems, lighting systems, test power systems,...
read more »
Location Chesterfield, Missouri Overview Amdocs renovated their Missouri data center facility, including upgrading data center infrastructure such as new in-row type cooling systems and new uninterruptible power supply systems. Fitzemeyer & Tocci provided full HVAC, electrical, plumbing, and fire...
read more »
Location South Burlington, Vermont Overview Tech Vault needed a conceptual design for a project to expand the existing data center space and infrastructure at their facility in Burlington.The new spaces included new data center whitespace, mechanical/electrical infrastructure spaces, and other support spaces....
read more »
Location Watertown, Massachusetts Overview A124 renovated an abandoned power plant facility into a new high tech research and development center for high capacity battery systems. The new facility included production and testing laboratories, clean utilities, design and administrative spaces,...
read more »
Location Billerica, Massachusetts Overview Lantheus Medical Imaging renovated existing hot cell and production lab space, an addition to the existing facility to house the new production un-shielded cyclotron, and upgrade of existing power supply rooms, hot cell lab, and...
read more »
Location Billerica, Massachusetts Overview Lantheus Medical Imaging installed a new 30 MeV, un-shielded cyclotron. The project included a multi-story addition to the existing facility to house the new production cyclotron and associated vault, extended beam remote target vaults, power...
read more »
Location Billerica, MA Overview Lantheus Medical Imaging needed to design a new ventilation air system and repair and modify existing systems to support the CPA 200 Phase I cleanrooms. Fitzemeyer & Tocci provided mechanical, engineering, and plumbing services for...
read more »